Dulles International Airport
- D2 Dulles Development
- D2 Home
- AeroTrain Exhibit
- About D2
- Projects
- AeroTrain System
- AeroTrain Maintenance Facility
- IAB Expansion
- Concourse C/D
- Concourse B Expansion
- Main Terminal Improvement Project
- Main Terminal AeroTrain Station
- Fourth Runway
- Future Fifth Runway
- Roadway Improvements
- Airport Traffic Control Tower
- Parking Garages
- Passenger Walkway
- Runway 12-30 Reconstruction
- Z-Gates
- D2 Photo Galleries
D2 Projects: AeroTrain System
A new way to move through Dulles
Statistics about the AeroTrain:
- Total Number of vehicles: 29
- Waiting Time Between Trains: 1.9 minutes
- Maximum Speed: 42 miles per hour
- Travel Time between Stations: 72 seconds
Construction Details:
- Estimated Program Cost: $1.4 billion - entire project including tunnels and stations
- Estimated Completion: 2009
Click here for a printable factsheet about this project (PDF document)
Click below for related information:
- AeroTrain System map - fullsize jpeg
- Construction Photo Gallery for this project
- NEW! View a narrated video showing high-speed AeroTrain testing in the tunnel at Dulles (link to YouTube)
- Read a paper which explains details about the AeroTrain system and its construction
- View the AeroTrain video showing a virtual tour of the future system
- AeroTrain Exhibit on display in the Main Terminal
- AeroTrain Maintenance Facility webpage
- Main Terminal Train Station webpage
