Metropolitan Washington Airport Authority

RFP 1-08-C177: High Temperature Hot Water Valve Inspection and Maintenance, Dulles Airport

|
PROJECT OVERVIEW
|
|
RFP Issue Date: May 12, 2008
Deadline for Proposals: Not Applicable - RFP Cancelled
Pre-Proposal Conference: None
Question Submission: Not Applicable - RFP Cancelled
Estimated Dollar Value: $50,000 - $100,000 annually
Project Duration: One year base period with two one-year options
Bond Requirements: None
Fee for Plans: $30.00 for printed documents; free download
CLICK HERE for instructions on purchasing documents.
Project Summary:
The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to inspect and maintain High Temperature Hot Water (HTHW) valves at Washington Dulles International Airport.
LDBE Requirement:
This RFP has a 100% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 100% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
238220 Pipe Fitting Contractors $13.0 Million
238290 Other Building Equipment Contractors $13.0 Million
Amendments Issued:
One, May 19, 2008 - RFP Cancelled.
CLICK HERE to download Amendment Documents
Last Updated May 19, 2008