Current Contracting Opportunities

The Metropolitan Washington Airports Authority has issued the following contracting opportunities:

 

Construction Opportunities

7-18-C007: Dulles Toll Road Pavement Repair and Resurfacing
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, supervision and traffic control traffic control operations to perform roadway pavement repair and resurfacing on the Dulles Toll Road
Solicitation Issue Date: May 3, 2018
Due Date for Submissions: June 6, 2018
Amendments Issued: None
LDBE Requirement: 30%
Additional Information

Design/Build Opportunities

8-18-C011: Design/Build Dulles Airport Metrorail Station Windscreens NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to design and construct windscreens at the Dulles Airport Metrorail Station.
Solicitation Issue Date: May 10, 2018
Due Date for Submissions: June 21, 2018
Amendments Issued: None
DBE Goal: 15%
Additional Information

Architectural & Engineering Opportunities

1-18-C151: AeroTrain Safety and Security Oversight Consultant Services, Dulles Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide professional engineering services to administer the safety oversight program for the AeroTrain System at Washington Dulles Airport in accordance with the code of federal regulations 49CFR-674.
Solicitation Issue Date: May 10, 2018
Due Date for Submissions: June 14, 2018
Amendments Issued: None
LDBE Requirement: None
Additional Information

Services Opportunities

1-18-C150: Removal & Disposal of Sewage, Sludge, Grease & Grit from Sanitary Waste Lift Stations, National Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to pump out, transport and dispose of sludge, grease and grit from the bottom of multiple sanitary lift stations and grease traps located at Ronald Reagan Washington National Airport on an as needed basis.
Solicitation Issue Date: May 23, 2018
Due Date for Submissions: June 21, 2018
Amendments Issued: None
LDBE Requirement: None
Additional Information

2-18-B0087: Annual Mobile Crane Inspections and Certifications, National Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform annual inspection and certification of mobile cranes at Ronald Reagan Washington National Airport.
Solicitation Issue Date: May 22, 2018
Due Date for Submissions: June 1, 2018
Amendments Issued: None
LDBE Requirement: None
Additional Information

1-18-C122: Organizational Design and Compensation Consulting Services NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide consulting support and expertise with organizational structure reviews and various compensation studies for the Metropolitan Washington Airports Authority.
Solicitation Issue Date: May 14, 2018
Due Date for Submissions: June 15, 2018
Amendments Issued: None
LDBE Requirement: 100%
Additional Information

2-18-B0100: Graphic Production Services UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide a variety of graphic productions for a wide range of production projects of various sizes for the Airports Authority and the Dulles Toll Road.
Solicitation Issue Date: May 8, 2018
Due Date for Submissions: June 7, 2018
Amendments Issued: Two
LDBE Requirement: 100%
Additional Information

Goods and Equipment Opportunities

2-18-P0165: Pickup Trucks, Dulles Airport NEW
Description: The Contractor shall furnish and deliver two pickup trucks in accordance with Airports Authority specifications for delivery to Washington Dulles International Airport.
Solicitation Issue Date: May 22, 2018
Due Date for Submissions: June 1, 2018
Amendments Issued: None
LDBE Requirement: None
Additional Information

1-18-B137: LED Lamps for Warehouse Stock, National Airport NEW
Description: The Contractor shall furnish and deliver LED Lamps (Lamp Par 38 LED 1835 Lumens by Firefly Technology) on an as-needed basis for warehouse stock at Ronald Reagan Washington National Airport. Note: This is a supply-only solicitation — installation is not included.
Solicitation Issue Date: May 17, 2018
Due Date for Submissions: June 8, 2018
Amendments Issued: None
LDBE Requirement: None
Additional Information

3-18-P0309: Two Heavy-Duty Trucks, Dulles Airport NEW
Description: The Contractor shall furnish and deliver a one ton 4 wheel drive chassis cab with utility body truck (Ford F-350 Super Duty) and a three quarter ton 4 wheel drive regular cab with 8’ fleetside bed truck (Ford F-250 Super Duty) in accordance with Airports Authority specifications for delivery to Washington Dulles International Airport.
Solicitation Issue Date: May 17, 2018
Due Date for Submissions: May 31, 2018
Amendments Issued: None
LDBE Requirement: None
Additional Information

3-18-P0216: Vinyl Grid Matting, Dulles Airport UPDATED
Description: The Contractor shall furnish vinyl grid matting in accordance with Airports Authority specifications for delivery to Washington Dulles International Airport.
Solicitation Issue Date: May 10, 2018
Due Date for Submissions: June 7, 2018
Amendments Issued: Two
LDBE Requirement: None
Additional Information

3-18-P0069: Bird Deterrent System, National Airport UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide hardware, software and on-site field training for a bird deterrent system, Scare Wars (or equal), in accordance with Airports Authority specifications for delivery to Ronald Reagan National Airport. The system shall include a master workstation, several handheld transmitters, a base antenna, and several remote bird deterrent units.
Solicitation Issue Date: May 8, 2018
Due Date for Submissions: June 8, 2018
Amendments Issued: One
LDBE Requirement: None
Additional Information

1-18-C120: Law Enforcement Ammunition UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide law enforcement ammunition for the Metropolitan Washington Airports Authority Police Department in accordance with Airports Authority specifications for delivery on an as-needed basis.
Solicitation Issue Date: April 25, 2018
Due Date for Submissions: May 31, 2018
Amendments Issued: Two
LDBE Requirement: None
Additional Information

1-18-C121: AEDs and CPR Manikins UPDATED
Description: The Contractor shall furnish AEDs and CPR Manikins in accordance with Airports Authority specifications for the Airports Authority's Public Safety Departments.
Solicitation Issue Date: April 6, 2018
Due Date for Submissions: May 31, 2018
Amendments Issued: Two
LDBE Requirement: None
Additional Information

Concessions Opportunities

6-18-C002: Scheduled Bus Service, Dulles Airport
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to manage and operate scheduled bus service between Washington Dulles International Airport and Metrorail's Wiehle-Reston East station.
Solicitation Issue Date: May 7, 2018
Due Date for Submissions: May 29, 2018
Amendments Issued: None
ACDBE Goal: 20%
Additional Information

Dulles Corridor Metrorail Project Opportunities

Project Overview - Dulles Corridor Metrorail Project

Phase One of the Dulles Corridor Metrorail Project constructed the new Metrorail Silver Line from the East Falls Church station on the Orange Line, through Tysons Corner and on to Wiehle Avenue in Reston. Phase Two will continue the line to Dulles International Airport and into Loudoun County.

Dulles Corridor Metrorail Project - Phase Two

Capital Rail Constructors, a joint venture of Clark Construction Group and Kiewit Infrastructure South, is the Metropolitan Washington Airports Authority's design-build contractor for Phase Two of the Dulles Corridor Metrorail Project, which will build 11.4 miles of track and six stations in Fairfax and Loudoun counties. Construction of Phase Two began in 2013 and will continue through 2018.

The following link will take you to the Capital Rail Constructors website where you can learn about subcontracting opportunities for Phase Two of the Dulles Corridor Metrorail Project:

Capital Rail Constructors Subcontracting Information

Additional Dulles Corridor Metrorail Project Contracting Opportunities

The Metropolitan Washington Airports Authority has issued the following additional contracting opportunities for the Dulles Corridor Metrorail Project:

8-18-C011: Design/Build Dulles Airport Metrorail Station Windscreens NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to design and construct windscreens at the Dulles Airport Metrorail Station.
Solicitation Issue Date: May 10, 2018
Due Date for Submissions: June 21, 2018
Amendments Issued: None
DBE Goal: 15%
Additional Information

Land Development Opportunities

Unsolicited Proposals for Western Lands at Dulles Airport
Description: The Metropolitan Washington Airports Authority has approximately 425 acres of land located at the western boundary of Washington Dulles International Airport along Route 606 which are available for development. Interested parties may submit an Unsolicited Proposal for the lease of any or all of this property.
Additional Information