Due to the demand for parking at Reagan National, we are adding over 1400 spaces to the airport's existing parking garages by building an additional level on two parking garages. This project began in 2008 and is nearing completion.

 
Current Project-Related Construction Alerts

A NEW, SEPARATE ENTRANCE TO GARAGE A IS OPEN FOR DAILY PARKING

  • About 500 spaces have opened on level 4 of Garage A and are dedicated to Daily Parking. Follow airport signage to the entrance.
  • Over 500 additional Daily spaces will open on a new, fifth level when the expansion project is complete.
  • The 277 spaces on level 1 have a separate entrance and are dedicated to Hourly Parking. Follow airport signage to the entrance.
Construction Phase 3
 Click on photo for larger image

GARAGE B/C: NEW, TOP LEVEL IS OPEN

843 new parking spaces on the new, fifth level of Garage B/C are open. Expansion work in this garage is complete.

The south end of level 5 has direct elevator service to Terminal B. At the north end, a disabled-accessible ramp leads down towards elevators to Terminal C.


Project Phases and Milestones

The project is now underway.  Below is a description of the project's phases:

 DCA_garage_chkbox.jpg Set up construction equipment near the parking garage.  Vehicle traffic flow will be maintained but some lanes will be closed or realigned along the roadways adjacent to the garages.
DCA_garage_chkbox.jpg Phase 1: Construct the first section of the new, fifth level of parking on Garage B/C which adds 72 new spaces to the total capacity of the Garage. Completed September 2008
DCA_garage_chkbox.jpg Phase 2: Construct the second section of the new, fifth level of parking on Garage B/C which adds 260  new spaces to the total capacity of the Garage. Completed February 2009
Checkkbox Phase 3: Construct the final section of the new, fifth level of parking on Garage B/C which brings a cumulative total of 843 new parking spaces to the Garage.  Completed Fall 2009
 In Progress Phase 4: Temporarily close one level of Garage A and construct a new, fifth level which will expand Garage A by 581 parking spaces when the project is complete.